Skip to product information
1 of 1

Viviscal

Viviscal PRO Hair Growth Supplements 3PK (180 Tablets)

Viviscal PRO Hair Growth Supplements 3PK (180 Tablets)

Regular price $214.99 CAD
Regular price $239.97 CAD Sale price $214.99 CAD
Sale Sold out
Shipping calculated at checkout.

About the Product

Unlock the secret to vibrant and fuller hair with Viviscal Professional Supplements, the premium choice for those seeking clinically proven results. Designed by experts in hair health, these supplements are meticulously crafted to nourish your hair from the inside out, promoting strength, vitality, and thickness.

Key Features:
  1. Clinically Proven Formula: Viviscal PRO Supplements are backed by extensive scientific research, demonstrating their efficacy in promoting hair growth and reducing hair thinning. Viviscal Professional is trusted by professionals worldwide to deliver results you can count on.
  2. Targeted Hair Nourishment: Experience the power of our exclusive AminoMar™ marine complex, a proprietary blend of marine proteins, minerals, and essential nutrients. This unique formula provides your hair follicles with the building blocks they need to flourish, resulting in visibly healthier and thicker hair.
  3. Drug-Free Solution: Say goodbye to harsh chemicals and embrace a natural approach to hair health. Viviscal Professional Supplements are drug-free and free from common allergens, making them a safe and sustainable choice for long-term hair care.
  4. Fast-Acting Results: Notice a positive change in as little as three to six months. Viviscal Professional is designed to work efficiently, helping you regain confidence in your hair's appearance sooner than you might expect.
  5. Trusted by Professionals: Recommended by dermatologists, hair care experts, and salon professionals, Viviscal Professional is the go-to choice for individuals serious about achieving optimal hair health. Join countless satisfied customers who have unlocked the secret to beautiful, resilient hair.
  6. Convenient Daily Supplement: Incorporating Viviscal Professional into your daily routine is simple and hassle-free. Take our easy-to-swallow tablets with food for optimal absorption, and watch as your hair transforms over time.

Directions for Use

  • 1 pill, twice a day, for thicker, fuller hair in as little as 3 months. In order to promote thicker hair, we recommend taking the supplement two times a day for 6 months.

Ingredients

Medicinal Ingredients

  • Biotin
    Quantity (Qty): 0.1 milligrams
  • Crassostrea gigas
    Quantity (Qty): 50.0 milligrams
  • L-Cystine
    Quantity (Qty): 12.5 milligrams
  • L-Methionine
    Quantity (Qty): 12.5 milligrams
  • Malpighia glabra
    Quantity (Qty): 80.0 milligrams
    Extract: 20.0 milligrams
    Potency: Vitamin C (120.0 : 1.0)
    DHE: 4.8 g
    Dry
  • Shark cartilage
    Quantity (Qty): 425.0 milligrams

List of non-medicinal ingredients:Fumed silicaGlycerol Hydroxypropyl methylcellulose Magnesiumstearate Maltodextrin Microcrystallinecellulose Modifiedfood starch Orange flavourTriacetin

View full details
  • Viviscal Professional - people notice an increase in volume thickness
  • Viviscal Professional - increase in hair thickness
  • Viviscal Professional - thicker hair

"It beyond works. I want to buy stock in that company."-- Gwyneth Paltrow

Viviscal™ PRO Supplements & Vitamins for healthy hair

Viviscal™ PRO Hair Growth Supplements contain the key nutrients you need to nourish thinning hair from within. Viviscal™ PRO is 100% drug-free. Viviscal™ PRO ingredients include the exclusive proprietary AminoMar C™ marine complex.

  • viviscal professional Drug Free
  • viviscal professional  - healthier, stronger hair
  • viviscal professional - clinically researched formula

ViviscalTM PRO contains more of the groundbreaking, proprietary marine complex AminoMarC™ than Viviscal® Extra Strength. 

  • Viviscal Professional - apple extract
  • Viviscal Professional - L-Cystine
  • Viviscal Professional - L-Methionine

Real People. Real Results.

Jade loves Viviscal Professional

Jade - 30s

After having my son, postpartum hair loss felt immediate and discouraging. My hair is a very important part of who I am and as I’ve grown & transitioned in life, so has my hair! Now my hair & edges look GOOD!

Judith loves Viviscal Professional

Judith - 60s

I’ve been taking Viviscal for a while and I feel fantastic about my hair and I feel better about myself. I feel so much more confident!

Read More Reviews & Testimonials

Better together: Boost results with the winning combination of Viviscal PRO products

For healthier stronger hair

Shop with us and enjoy

  • Free shippiong on $85 plus
  • Free returns
  • 30 day guarantee
  • save 10% use code welcome10

Frequently Asked Questions

What is Viviscal?

Viviscal PRO is a clinically proven, 100% drug free dietary
supplement for fuller and thicker hair. Viviscal PRO is
backed by more than 25 years of continuous research by
some of the world’s leading hair growth clinicians, making
it one of the most researched hair growth supplements in
the industry today.

Viviscal PRO Supplements are scientifically formulated
with the ground-breaking, exclusive marine complex AminoMar®, which helps to nourish thinning hair from
within and promote existing hair growth.

Along with AminoMar, Viviscal PRO Supplements also contain key
nutrients essential for healthy hair growth, including
Biotin, Apple Extract and Vitamin C. Viviscal PRO is suitable for
genders of all hair types
Once again, Viviscal PRO supplements
supply vital nutrients to the hair follicles through the
bloodstream to prolong the hair growth cycle and promote
existing hair growth.
Viviscal PRO was formulated to provide healthy scalp and
hair, strengthen nails and healthier looking skin.

How do Viviscal Supplements Work?

Viviscal PRO Supplements nourish thinning hair and help to support healthy hair from within.
Everyday stress, poor nutrition, age, heredity, medication and damage caused by the environment and overstyling can impact the health of your hair and lead to breakage
and excess shedding. Therefore, it’s important to ensure that the hair and scalp are healthy, conditioned and nourished to maintain the ideal environment for healthy
hair.

If your diet lacks specific nutrients, including vitamins, minerals or protein, it can affect the condition and strength of your hair. Viviscal PRO Supplements supply vital
nutrients, including a unique blend of vitamins and minerals, promoting healthier and stronger hair .
Viviscal PRO Supplements work in four stages over a six-month period. Users may notice a difference in as
little as three or four months.

Stage 1
Works to nourish hair follicles from within.

Stage 2
Strengthens and supports hair from the inside out.

Stage 3
Supports the hair to become healthy and strong where it
has become damaged.

Stage 4
Makes your hair noticeably thicker, fuller, healthier
looking and more vibrant. It increases the diameter of
your hair.

Does Viviscal Actually Regrow Hair?

Not quite ‘regrow,’ but it helps your current hair to grow along with new hair. The keyword being ‘new hair’ as hair grows from the roots or follicle under the scalp. When
Viviscal PRO starts to work, you will notice new baby hairs beginning to grow. If you experience thinning hair, you should grow new hair, but it will be shorter than the rest of your hair.

Take 2 tablets per day for up to 6 months. Then we
recommend taking 1 tablet per day for upto 3 months whilst monitoring your hair shedding. Many continue to take Viviscal PRO Hair Health Supplements for overall healthy hair, skin and nails as a part of their daily wellness and beauty regime.

Will Viviscal Supplements work for me?

Viviscal dietary supplements helps to achieve the thicker, fuller looking hair that you desire and nourish hair from within. There are many factors that can cause of hair loss and we recommend that you consult your physician before beginning any dietary supplement. Viviscal dietary supplements have been proven to work in clinical studies, including a recent double-blind, placebo-controlled scientific research program, which demonstrated an 18.3% reduction in hair shedding and a 7.4% increase in hair thickness over a six-month period.

How long will it take to see results of Viviscal Supplements

Viviscal Maximum Strength works in four stages over a six-month period. Users may notice a difference in as little as three or four months.

  • Stage 1 - Hair follicles are nourished through the consistent intake of nutrients and the marine complex AminoMar in each tablet.
  • Stage 2 - Thin and wispy hair is strengthened through continued nourishment.
  • Stage 3 - Breakage and thinning continue to decline as the tablets encourage the growth* of existing hair.
  • Stage 4 - Hair becomes stronger, healthier and more vibrant.

Hair becomes stronger, healthier and more vibrant.

Are Viviscal Supplements suitable for everyone?

Viviscal dietary supplements are suitable for both men and women over the age of 18, of all hair types. Viviscal is not suitable for children under 18; those with an allergy to fish or shellfish; or women who may be pregnant or breastfeeding. It is always advisable to consult your doctor before taking any dietary supplement.

Are there any negative side effects associated with Viviscal Supplements?

Viviscal is a drug free dietary supplement that contains some ingredients of natural origins. However, Viviscal is not recommended for those with an allergy to fish or shellfish, or for women who are pregnant or breastfeeding. If you have known intolerances or allergies, please review the ingredients in Viviscal dietary supplements prior to taking the supplements.

Will Viviscal Supplements interfere with medications?

It is always advisable to consult your doctor before taking any dietary supplement.

Do Viviscal Supplements contain drugs such as Minoxidil or Finastride?

No. Viviscal is drug free.

Which Viviscal Product is right for me?

The Viviscal Hair Nourishment System and Gorgeous Growth Range includes a variety of products that allow you to have thicker, fuller, healthier and more vibrant looking hair. Viviscal dietary supplements contain the proprietary marine complex AminoMar C™, plus a blend of vitamins and minerals to nourish thinning hair and promote existing hair growth from within. This vitamin supplement has been clinically proven to promote the thicker, fuller looking hair in six months. Viviscal Gorgeous Growth Densifying range also contains the exclusive Ana:Tel™ complex, biotin, keratin and zinc to promote healthy looking hair growth. Ana:Tel ™ extends the hair growth phase and reduces hair shedding.

Viviscal Gorgeous Growth Shampoo gives you the thicker, fuller looking hair your desire. Achieve weightless conditioning with the new Viviscal Gorgeous Growth Densifying Conditioner. Viviscal Gorgeous Growth Densifying Elixir is the ultimate body-boosting leave in elixir for thicker, fuller looking hair. Viviscal Hair and Scalp Serum helps to maintain a healthy scalp and promotes the appearance of thicker, fuller looking hair. Viviscal Densifying Hair Fibers instantly volumize hair, giving you thicker looking hair in seconds with no dyes to smear or stain.

Choose the right Viviscal products for you by taking the Viviscal Healthy Hair Check. Use this specially developed hair care tool to get expert advice on your hair condition and take the first steps towards the thicker, fuller, healthier hair you desire.