Toppik Hair Building Fibers (55g)
Toppik Hair Building Fibers (55g)
Couldn't load pickup availability
AVAILABLE COLOURS
*Please note that the following colors in 55g bottles have been discontinued by the manufacturer: Light Brown, Medium Blonde, Light Blonde, White, Grey, and Auburn. However, these colors remain available in 12g bottles and in 4 pack bottle value packs.

WHAT IT IS
Toppik Hair Building Fibers are made from natural keratin protein and seamlessly blend with your existing hair to create the look of thicker, fuller hair instantly.
WHAT IT DOES
- Instantly fills in thinning spots and receding hairlines
- Conceals areas of hair loss and bald spots
- Transforms fine, limp hair into a thick, voluminous look
- Perfect for root touch-ups between color appointments
WHAT ELSE YOU NEED TO KNOW
Toppik Hair Building Fibers stay in place, resisting wind, rain, and sweat for all-day confidence. Available in several shades that can be combined to match virtually any hair color, Toppik works on all hair types and textures. It's also ideal for blending part lines, covering extension tracks, and refreshing your roots. Simply wash out with shampoo for easy removal.
                    
                      
                      
                        How to Apply
                      
                    
                    
                  
                  How to Apply
1. Dry and style hair as usual.
2. Shake or spray (with Toppik Spray Applicator) hair fibers into thinning areas.
3. If applying hair fibers near the hairline, use Toppik Hairline Optimizer to achieve a natural-looking front hairline.
4. Gently pat hair to disperse hair fibers.
5. If desired, lightly comb, brush, or style your hair after applying hair fibers.
6. For best results, use Toppik FiberHold Spray to finish for longer-lasting results.
                    
                      
                      
                        Ingredients
                      
                    
                    
                  
                  Ingredients
Keratin, Ammonium Chloride, Silica, DMDM Hydantoin. May Contain/peut contenir/puede contener: Yellow 6 (CI 15985), Yellow 5 (CI 19140), Red 22 (CI 45380), Red 33 (CI 17200), Blue 1 (CI 42090), Green 5 (CI 61570), Green 3 (CI 42053), Green 6 (CI 61565), Orange 4 (CI 15510)
 
 
 

What customers are saying
For a naturally thicker, fuller look in a moment's notice
Durable, stays in place all day from shampoo to shampoo
Made from the highest grade of natural keratin, Toppik Hair Building Fibers are nearly identical to human hair, which allows the fibers to blend naturally and bind undetectably to even the finest hair.
Real People. Real Results.
 
Toppik helped Thom look & feel years younger
Toppik Hair Building Fibers help maintain the appearance of a full head of hair.
 
Charity won’t leave home without Toppik
Toppik Hair Building Fibers instantly disguise areas of thinning, , freeing users from the perceived stigma of hair loss.
Unlock ultimate results: Experience the power of Toppik products together
 
  Discover the Hair Solutions Canada Difference
When you choose Hair Solutions Canada, you become part of our community. Since 2011, we’ve been dedicated to delivering premium hair care solutions and exceptional service, empowering every customer to feel confident and valued. Start your journey with us today—experience the difference for yourself.
Shop with us and enjoy
Frequently Asked Questions
                    
                    
                      What are Toppik Hair Building Fibers made of?
                    
                    
                  
                  Toppik Hair Building Fibers are made of Keratin protein - the same thing that makes up human hair. The Keratin protein comes from a natural wool source, which is the closest match to human hair.
                    
                    
                      How long will Toppik Hair Building Fibers stay in place?
                    
                    
                  
                  Toppik Hair Building Fibers stay until you wash your hair. They may shift but can be easily touched up. Many individuals who go to the salon weekly for a shampoo/set or a blow out will leave the Fibers in until their next appointment.
                    
                    
                      Can I use Toppik Hair Building Fibers with styling tools and products?
                    
                    
                  
                  It is recommended that Toppik Hair Building Fibers be applied after the use of any styling tools such as hairdryers, flat irons or curling irons. Styling products (other than hairspray) should be applied to the hair prior to applying Toppik Hair Building Fibers. Applying gels, mousses, pastes, serums, and the like after applying Fibers may cause shifting the Fibers and could expose the areas that were meant to be covered. Let styling products dry before applying Fibers.
                    
                    
                      Do Toppik Hair Building Fibers affect hair growth?
                    
                    
                  
                  Toppik Hair Building Fibers do not encourage or discourage hair hair growth. The natural Keratin Fibers will not clog pores or affect a scalp condition.
                    
                    
                      How long will a bottle of Hair Building Fibers last?
                    
                    
                  
                  It depends on how frequently you use the product, the amount of the product you use each time, and the size of product you purchase. Below are some general guidelines:
Hair Building Fibers - Travel (3g): Approximately 7 days
Hair Building Fibers - Regular (12g): Approximately 30 days
Hair Building Fibers - Economy (27.5g): Approximately 60 days
Hair Building Fibers - Giant (55g): Approximately 120 days
                    
                    
                      Can I mix different colours of Toppik Hair Building Fibers?
                    
                    
                  
                  Yes, you can mix different shades of Hair Building Fibers. In fact, it is often encouraged to mix different shades in order to find the closest match to your own color, especially when working with blonde or gray hair. The product can either be mixed directly in the hair (use the lighter color first, and then layer the darker color over it).
                    
                    
                      If I am bald can I use Toppik?
                    
                    
                  
                  Unfortunately, Toppik is ineffective on individuals with no hair. Toppik works by adhering to existing hair on the head and is most effective when used in conjunction with thin or thinning hair. So, without some existing hair, the Fibers will not stay in and the product cannot achieve the desired results.
                    
                    
                      Will Toppik come off my clothes, pillows, etc...?
                    
                    
                  
                  Toppik will not come off on clothes or pillows. Once applied, the Toppik Fibers will be locked to your existing hair, ensuring a long-lasting look of thickness. You will need to use shampoo to completely remove the Toppik from your hair.
Very good product, a bit messy at time but it really covers small patches and stays on all day.
In total, i amd very satisfied with the service and quality of their products
I wish it was more affordable ! Still less durable against wind or water but overall it is great and long lasting between the hair washes
Can clump up at times. Good coverage of thinning patches of hair. Doesn't come off on pillows or clothes. Good produ t!
I always choose Hair Solutions Canada for their excellent transactions and swift delivery service. Their A++ performance never disappoints.
 
               
     
     
     
     
                   
                   
                   
                   
                   
                   
                   
                   
                  